Reed House Rehabilitation

Croy Engineering provided program management services, civil engineering design, and construction administration services for the Historic Reed House restoration. The 5,147 square foot, two-story dwelling dates back to 1910 and will now be used as a special events center owned and operated by the City of Smyrna. The conversion to public space required the remediation […]

Ryland Pike Waterline Relocation

Croy Engineering is currently under contract to design the replacement and relocation of approximately 3 miles of 6-inch asbestos cement water main. The new water main will consist of a more durable and higher capacity 8-inch ductile iron line. This project will start east of US 72 and extend to Everett Drive in Madison County. […]

Smyrna Recycling Center

Croy undertook a site selection process to find three potential locations within a 3-mile targeted area for the development of a recycling center for the City of Smyrna. This process included identifying potential sites and preparing conceptual site plans and cost estimates for consideration by the City. The selected site was an existing 0.95-acre oil […]

Ward Street – Belmont Hills Connector and Roundabout

As part of the City of Smyrna’s program management contract, Croy Engineering prepared roadway design plans for the new connector located between the redevelopment project of Belmont Hills and already existing Ward Street. It was determined that a single lane roundabout would be the most cost effective solution, provide the greatest benefit to traffic movements, […]

Department of Driver Services Facility

Croy provided planning, design, permitting, and project management services for a DDS facility on behalf of Paulding County, GA. The project included the design of a master stormwater detention and water quality system to account for a future 0.8-mile adjoining roadway and the future development of the adjacent site, as well as the design of […]

Lewis Road Roundabout and Improvements

Lewis Road serves as a direct connection from downtown Powder Springs to C.H. James Parkway. In order to accommodate truck traffic and eliminate an undesirable one-way pair configuration, Croy Engineering widened Lewis Road to allow for two-way traffic. Key Project Components and Services Included: Performance of complete survey database, traffic analysis, preliminary engineering, right-of-way plans […]

City of Kennesaw 2011 and 2016 SPLOST Program Management and On-Call Engineering

Croy Engineering was selected as the City of Kennesaw’s Program Manager to assist with implementation of their 2011 and 2016 SPLOST programs. In this capacity, Croy has been assigned numerous tasks including roadway design, traffic study and analysis, plan review, ROW acquisition assistance, and construction management/inspection. Projects have included: Dallas/Watts Intersection Improvements – Roundabout design […]

Spring Road Improvements

In order to enhance the efficiency of traffic flow, Croy Engineering collaborated with the City of Smyrna to create design plans for the widening and reconstruction of Spring Road from west of Bell Drive to the US 41 intersection. Project components and services included: Widening of roadway from four lanes to six, with three lanes […]

HD Supply Corporate Office

Located on 5 ½ acres of the southwest corner of I-75 and Cumberland Boulevard, this 8-story office building situated on top of a 6-level parking deck is the future home to HD Supply’s Corporate Office. Overcoming design challenges on the project that included the steep terrain of the site and the strict requirements within the […]

Loretto City Pool Complex

Croy Engineering was retained by the City of Loretto, Tennessee to manage the design and construction of a new municipal pool complex that was identified in the 2014 City Park and Recreation Master Plan also performed by Croy. The project represented the first major renovation to the park in many years, and was the largest […]