Reed House Rehabilitation

Croy Engineering provided program management services, civil engineering design, and construction administration services for the Historic Reed House restoration. The 5,147 square foot, two-story dwelling dates back to 1910 and will now be used as a special events center owned and operated by the City of Smyrna. The conversion to public space required the remediation […]

On-Call Engineering Survey Services at Hartsfield-Jackson Atlanta International Airport

Croy, partnered with CERM, is providing on-call land surveying services in support of engineering work undertaken by the Department of Aviation Planning and Development Department at Hartsfield-Jackson Atlanta International Airport. The surveying services will include: Topographic definition, including infields, pavements, roads and parking facilities Structure and utility locations in accordance with FAA AC 150/5300 – […]

Powder Springs Linear Park

Following the construction of Richard D Sailors Parkway, the City of Powder Springs used land that remained between the parkway and the Silver Comet Trail to create a passive-use park. Funded with a combination of SPLOST money and Impact Fees, Phase 1 of the park features: New parking lot and landscaping Concession and restroom building […]

Providence Place Apartments

“It has been a pleasure working with [Croy] on our Providence Place development in Huntsville. This project is quite complex due to the combination of high density and traditional design elements. …Croy Engineering has done an outstanding job of guiding us through the city processes and the intricacies of the engineering design.” –Stillman Knight, Director […]

Lewis Road Roundabout and Improvements

Lewis Road serves as a direct connection from downtown Powder Springs to C.H. James Parkway. In order to accommodate truck traffic and eliminate an undesirable one-way pair configuration, Croy Engineering widened Lewis Road to allow for two-way traffic. Key Project Components and Services Included: Performance of complete survey database, traffic analysis, preliminary engineering, right-of-way plans […]

City of Marietta Stormwater Structure Inventory

Croy Engineering provided GPS/GIS/Surveying services to the City of Marietta, which were related to data collection for the City’s stormwater system structures located in the City right-of-way. The City of Marietta encompasses approximately 23.2 square miles and includes 6,000+/- storm structures. The inventory data was determined to be “survey grade” quality and used for modeling […]

City of Kennesaw 2011 and 2016 SPLOST Program Management and On-Call Engineering

Croy Engineering was selected as the City of Kennesaw’s Program Manager to assist with implementation of their 2011 and 2016 SPLOST programs. In this capacity, Croy has been assigned numerous tasks including roadway design, traffic study and analysis, plan review, ROW acquisition assistance, and construction management/inspection. Projects have included: Dallas/Watts Intersection Improvements – Roundabout design […]

Spring Road Improvements

In order to enhance the efficiency of traffic flow, Croy Engineering collaborated with the City of Smyrna to create design plans for the widening and reconstruction of Spring Road from west of Bell Drive to the US 41 intersection. Project components and services included: Widening of roadway from four lanes to six, with three lanes […]

Westover Boulevard Extension

The Westover Boulevard Extension will provide a new north/south roadway connection between Westover Boulevard and Ledo Road in Albany, GA, providing significant congestion relief to both Nottingham Way and the surrounding roadway network. The underpass will consist of two lanes in each direction with a raised/flush center median, curb and gutter, and sidewalk. Because of […]

Northwinds Parkway Extension

Performed for the North Fulton CID, the project extended Northwinds Parkway from its previous terminus at its intersection with Kimball Bridge Road to Old Milton Parkway/SR 120. The completed projected included the design of a new 4-lane roadway with raised median, curb and gutter, bike lanes, and a 12’ foot multi-use path.  The project also […]