Spring Road Improvements

In order to enhance the efficiency of traffic flow, Croy Engineering collaborated with the City of Smyrna to create design plans for the widening and reconstruction of Spring Road from west of Bell Drive to the US 41 intersection. Project components and services included: Widening of roadway from four lanes to six, with three lanes […]

Westover Boulevard Extension

The Westover Boulevard Extension will provide a new north/south roadway connection between Westover Boulevard and Ledo Road in Albany, GA, providing significant congestion relief to both Nottingham Way and the surrounding roadway network. The underpass will consist of two lanes in each direction with a raised/flush center median, curb and gutter, and sidewalk. Because of […]

Northwinds Parkway Extension

Performed for the North Fulton CID, the project extended Northwinds Parkway from its previous terminus at its intersection with Kimball Bridge Road to Old Milton Parkway/SR 120. The completed projected included the design of a new 4-lane roadway with raised median, curb and gutter, bike lanes, and a 12’ foot multi-use path.  The project also […]

Metter Municipal Airport

For more than two decades, Croy staff have been providing aviation services at the Metter Municipal Airport that have included survey, permitting, design, bidding and construction administration. Under multiple CIP’s the firm has performed a variety of projects that most recently include the following: Apron expansion Rehabilitation of existing apron and automobile parking area Extension […]

Gilmer County Airport

Croy’s staff assisted Gilmer County with the original airport site selection, prepared the Airport Master Plan, and assisted the County with the design and construction of the initial 3,500’ x 50’ runway. Over its decades of service to Gilmer County, Croy has updated the Airport Layout Plan, Exhibit “A” Property Map, Terminal Area Plan, and […]

Windy Hill Boulevard

The proposed Windy Hill Boulevard project consists of reconstructing the existing 5-lane roadway between South Cobb Drive and Atlanta Road with a boulevard section that will accommodate all forms of travel including vehicular, pedestrian, bicycle, and transit.  The proposed roadway will include:  Four express lanes to facilitate east/west through traffic by providing unfettered mobility via […]

Commerce Park – Phase I

Croy Engineering prepared multiple conceptual site and roadway layouts, including exhibits for presentations, for a 125-acre manufacturing and warehouse site for the Paulding County Industrial Building Authority (IBA).  Croy further developed construction plans for the associated access road based on the approved concept, including designing the roadway pavement section, profiles, striping, and signage.  The utility […]

Richland Creek Reservoir Raw Water Pipeline

Croy Engineering is part of the design-build team for the Richland Creek Reservoir Raw Water Pipeline project. The Raw Water Pipeline will be constructed between the Etowah River and the new Richland Creek Reservoir as part of the Richland Creek Water Supply Program, with the purpose of fulfilling the County’s future water needs over the […]

Urban Water Reuse Booster Pump Station: Pumpkinvine Creek

Paulding County designated the Pumpkinvine Creek drainage area service boundary to be an Urban Water Reuse district, and several residential subdivisions have been developed in this area with Reuse Water infrastructure installed. Croy Engineering developed construction plans for a Reuse Water Booster Pump Station at the Pumpkinvine Water Reclamation Facility (WRF). This project consisted of: […]

Sewerage Collection, Transportation & Treatment System

Croy Engineering assisted the City of Hagan with obtaining financing to develop a public sewerage system where none existed. Croy provided, survey, mapping, design, NEPA/GEPA documentation, permitting, contracting, and construction administration services for the construction of a collection, transmission and land application system for a projected average daily flow of 0.15 mgd.  Financing consisted of […]