Croy Engineering was responsible for site design and project management which included assembling a design team of Architects, MEP and Geotechnical Engineers, and providing survey services. The project consisted of:

  • $4 million film studio complex
  • 11 acre site-development
  • Two 20,000 sf. pre-engineered metal building film stages, (2) additional 20,000sf stages planned for future growth
  • 11,000 sf. Workshop build-out
  • 5,000 sf. office space build-out

Site design activities included:

  • Producing grading and drainage plans
  • Completing hydraulic studies/reports for permitting
  • Coordinating with local utilities for on-site infrastructure
  • Producing/permitting erosion control plans
  • Permitting entrance plans with GDOT