fullscreen

Croy Engineering has recently been tasked with the siting layout, site design, and permitting for a new Aircraft Rescue and Firefighting (ARFF) building, apron area, and proposed hangar building to the southeast of Runway 9/27. Croy is also analyzing landside access to the buildings and preparing easement exhibits to ensure continued access to the site as well as analyzing utility connections in the area.

Additional services for this project include:

  • Hydrology study
  • Storm water management design
  • Preparation of construction safety and phasing plan
  • All agency coordination and permitting

ADDITIONAL PROJECTS