Performed for the North Fulton CID, the project extended Northwinds Parkway from its previous terminus at its intersection with Kimball Bridge Road to Old Milton Parkway/SR 120. The completed projected included the design of a new 4-lane roadway with raised median, curb and gutter, bike lanes, and a 12’ foot multi-use path.  The project also included an urban longitudinal drainage system, extensive landscaping and a new signal at the intersection with Kimball Bridge.

Projects services included:

  • Preliminary and final roadway design
  • Bicycle/Pedestrian facility design
  • Surveying/Photogrammetry
  • Environmental permitting
  • Stormwater management
  • Traffic engineering
  • Erosion and sedimentation control
  • ROW plans
  • Utility coordination