Transportation and Construction Management Projects Bring Increased Mobility and Accessibility
As the On-Call Engineer for the City of Marietta’s SPLOST Program, Croy has performed a variety of design and construction management/inspection projects that have included:
Fairground Street Improvements
This project consisted of the addition of a median, minor widening, and shoulder improvements along sections of Fairground Street from Cobb Parkway to South Marietta Parkway. It also included the addition of a roundabout at Allgood Road, and intersection and signalization improvements at both State Routes.
Kennesaw Avenue Reconstruction and Bridge Replacement
This transportation project included replacing an aging weight-restricted bridge with a new open bottom arch culvert, upgrading existing sidewalk to current Americans with Disabilities Act (ADA) standards, and replacing the existing curb and gutter along the length of the project while maintaining existing drainage patterns. Additionally, the northern portion of the roadway was narrowed to 12-foot lanes from 13.5-foot lanes as a traffic calming approach.
Lawrence Street Improvements
Transportation design improvements to Lawrence Street for this project included sight distance, sidewalks, ADA standards, and drainage improvements.
Project Details
Location
Marietta, Georgia
Project Highlights
- 2005, 2011, and 2016 SPLOST on-call engineering
- Variety of transportation and construction management projects
- Croy client since 2005